Implementing an Energy Management System and Policy within Manufacturing Facility at Bayan Lepas. Penang.
Background for EMS Requirement
- No Energy Management Policy in place within the manufacturing facility and no centralized , real time monitoring of energy consumption systems. •
- Electricity consumption per month on an average at the facility was 800,000 RM and tariff E2.
- The Management was on pursuing energy management operational efficiency, Operational efficiency and Customer Vendor mapping
Our Solution for Energy Management System and Policy
Through Solnovations Real time energy management system. We were able to demo to the client the use of monitoring real time Maximum demand and energy consumption management .
Real time monitoring of Maximum demand at site with real time alerts helps save costs.
Maximum Demand Measurement Of 11kV Incoming
Maximum demand in the facility is not consistent with the delta between the highest recorded value and the average being over 300KW which can translated to nearly RM 10000 extra a month.